【概要描述】These weld quality failures will occur when the used welded pipe units is making pipes: ① through-length lap welding. ② Periodic lap welding. ③ Open the seam. ④ Trachoma. ⑤ Peach-shaped tube. ⑥ Weld seam gnawed. ⑦Outer burr planing. ⑧ Heating. ⑨ The current is small. ⑩ Melting of induction coils and electrodes. ⑪ Fire. ⑫ "No high pressure" phenomenon. We can summarize 12 causes of weld quality failures.
Weld quality failure caused by used welded pipe units (7)
【概要描述】These weld quality failures will occur when the used welded pipe units is making pipes: ① through-length lap welding. ② Periodic lap welding. ③ Open the seam. ④ Trachoma. ⑤ Peach-shaped tube. ⑥ Weld seam gnawed. ⑦Outer burr planing. ⑧ Heating. ⑨ The current is small. ⑩ Melting of induction coils and electrodes. ⑪ Fire. ⑫ "No high pressure" phenomenon. We can summarize 12 causes of weld quality failures.
- Sort:Information
- Auth:
- Source:
- Release time:2022-03-17 11:30
- Pvs:
When manufacturing welded pipes for used welded pipe units, judging that the quality of the welded pipes meets the standard depends on the quality of the welds. Therefore, the quality of the weld is very important, so sometimes it is necessary to rule out the quality of the weld. We perform analyses to understand weld quality failures.
These weld quality failures will occur when the used welded pipe units is making pipes: ① through-length lap welding. ② Periodic lap welding. ③ Open the seam. ④ Trachoma. ⑤ Peach-shaped tube. ⑥ Weld seam gnawed. ⑦Outer burr planing. ⑧ Heating. ⑨ The current is small. ⑩ Melting of induction coils and electrodes. ⑪ Fire. ⑫ "No high pressure" phenomenon. We can summarize 12 causes of weld quality failures.
Heating
There are two main forms of delivering high-frequency current to the pipe wall:
(1) The induction type, which is based on the induction coil of single-turn or multi-turn structure, which is induction welding.
(2) The contact type, which is mainly based on the movable electrode contact structure, which is contact welding.
In continuous production, the application of inductive structure is more common. Below we describe the common accidents in the heating of the tube blank.
Low current
When the current is small, the heating temperature and heating speed of the weld will be affected to varying degrees, and the quality of the weld is sometimes difficult to guarantee. In addition to insufficient output power, the reasons for the low current are mainly the following aspects in the process adjustment:
(1) The position and number of magnetic rods. In addition to the quality of the magnetic bar itself, the installation position and quantity are also very important. Generally, the front end of the magnetic bar should extend beyond the center line of the squeeze roller by more than 20 mm, and the rear end should extend beyond the induction coil or electrode by 60 mm (Figure 27). ) ,
The quantity is based on the ratio of pipe diameter to magnet bar section not less than 3:1. If the above requirements cannot be met, they should be dealt with in a timely manner.
(2) Cooling effect. The magnetic bar will reduce the magnetic effect after being heated. The longer the heating time and the higher the heating temperature, the more serious the magnetic damage will be. Therefore, it is not only required that the magnetic bar itself has a better heat resistance effect, but also the external cooling must be timely. The cooling water must have both a flow rate and a flow rate, so that the magnetic bar can often work at a low temperature and prolong the service life of the magnetic bar.
(3) The position of the induction coil (or electrode). Because high-frequency current has proximity effect and skin effect, both the induction coil and the electrode should be as close as possible to the squeeze point. In addition, the gap between the induction coil and the pipe wall should preferably be controlled within 5 mm (the gap between the two electrodes should not be too large, which can generally be determined according to the width of the pipe seam, preferably 3 to 6 mm), so that it can be To ensure the heating efficiency of the weld.
(4) Weld seam control. The direction of the welding seam, the opening angle and the height position of the welding seam all have a certain influence on the size of the welding current, so when adjusting, it is necessary to ensure that the welding seam can be accurately aligned with the extrusion center, and the amount of left and right swing should not be too large. 1. 5 mm is better. The opening angle of the "V" shape of the welding seam depends on the diameter of the pipe to be produced, and is controlled between 3° and 10°, that is, the width of the pipe seam at the induction coil should not exceed 8 mm, and the width of the pipe seam at the electrode should not exceed 8 mm. 6 mm. The above can be obtained by adjusting the reduction amount of the guide roller. In addition, after the overall position of the guide roller is properly increased, the edge of the tube blank can be fully stretched, especially for the production of thin-walled tubes, which reduces edge wrinkles and stabilizes the current flow.
(5) Match. The current size and welding speed matching adjustment is a passive approach. When the current output cannot be increased, in order to ensure the quality of the weld, the only way to reduce the welding speed is to prolong the heating time of the weld to meet the temperature requirements of the weld.
The above is one of the reasons for the quality failure of the welding seam when the used welded pipe units is making pipes, and the heating and current are small. The main reasons for the formation of heating are (1) induction type, which is mainly induction coil with single-turn or multi-turn structure, which is induction welding. (2) The contact type is mainly based on the movable electrode contact structure, which is contact welding. There are also reasons for the formation of small currents mainly due to (1) the position and number of magnetic rods. (2) Cooling effect. (3) The position of the induction coil (or electrode). (4) Weld seam control. (5) Match.
More News
Time of issue : 2024-12-05
1.Theoretical Training:
Equipment knowledge: Understand the basic components of the slitting unit and its working principle.
Operation specifications: Familiar with the operation procedures, including starting, stopping, adjusting parameters, common problem handling, etc.
Safety training: Understand the safety risks in equipment operation and corresponding preventive measures, and be familiar with emergency handling methods in emergency situations.
2.Practical operation:
On-site operation demonstration: An experienced operator gives a demonstration on site to guide new employees to master basic operating skills.
Hands-on practice: Let new employees operate the equipment themselves, accumulate experience in actual operation, and solve the problems encountered.
3.Maintenance:
Daily inspection: Train employees to understand the contents and methods of daily inspection of equipment, including cleaning, lubrication, fastening and other work.
Troubleshooting: Teach employees how to identify common equipment failures, understand basic troubleshooting methods and when professional maintenance personnel are required to intervene.
4.Efficiency optimization:
Production Management: Explain how to rationally arrange production tasks to improve equipment utilization and production efficiency.
Data Analysis: Teach employees how to record and analyze production data to find and improve the weak links in production.
5.Assessment and continuous improvement:
Assessment: Evaluate the effectiveness of training through examinations or practical assessments to ensure that employees have the necessary knowledge and skills.
Continuous improvement: Regularly organize training review and skill upgrading courses, and constantly improve the training content according to the actual production and equipment update.
After the training, new employees can work under the supervision of an experienced operator until they are fully competent.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
1.Theoretical Training:
Equipment knowledge: Understand the basic components of the slitting unit and its working principle.
Operation specifications: Familiar with the operation procedures, including starting, stopping, adjusting parameters, common problem handling, etc.
Safety training: Understand the safety risks in equipment operation and corresponding preventive measures, and be familiar with emergency handling methods in emergency situations.
2.Practical operation:
On-site operation demonstration: An experienced operator gives a demonstration on site to guide new employees to master basic operating skills.
Hands-on practice: Let new employees operate the equipment themselves, accumulate experience in actual operation, and solve the problems encountered.
3.Maintenance:
Daily inspection: Train employees to understand the contents and methods of daily inspection of equipment, including cleaning, lubrication, fastening and other work.
Troubleshooting: Teach employees how to identify common equipment failures, understand basic troubleshooting methods and when professional maintenance personnel are required to intervene.
4.Efficiency optimization:
Production Management: Explain how to rationally arrange production tasks to improve equipment utilization and production efficiency.
Data Analysis: Teach employees how to record and analyze production data to find and improve the weak links in production.
5.Assessment and continuous improvement:
Assessment: Evaluate the effectiveness of training through examinations or practical assessments to ensure that employees have the necessary knowledge and skills.
Continuous improvement: Regularly organize training review and skill upgrading courses, and constantly improve the training content according to the actual production and equipment update.
After the training, new employees can work under the supervision of an experienced operator until they are fully competent.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Time of issue : 2024-12-04
1.Installation and commissioning:
Position selection: According to the layout and process requirements of the production line, the installation position of the looping clip motor is reasonably selected.
Fixed and connected: Install the motor firmly in the designated position, and connect it with the corresponding mechanical transmission components.
Electrical wiring: Correct wiring to ensure reliable connection between the motor and the control system.
2.Start and Stop:
Check before starting: Check the lubrication state of the motor and transmission parts, whether the fasteners are loose, and whether the electrical line is normal.
Smooth start: When starting the motor, it should avoid the impact of instantaneous large current, and use soft start or frequency conversion start.
Normal shutdown: The shutdown should gradually reduce the speed of the motor to prevent sudden stop from impacting the equipment.
3.Operation and control:
Constant tension: The tension control system is used to maintain a constant tension during the operation of the looping motor to avoid strip relaxation or pulling.
Speed synchronization: Adjust the running speed of the motor according to the process requirements, so that it matches the speed of the equipment before and after the process.
Feedback control: Through the sensor and feedback system, real-time monitoring of the motor operating status, adjust the parameters to ensure the stable operation of the production line.
4.Maintenance and maintenance:
Regular inspection: Regularly check the wear of the motor and transmission parts, and replace the damaged parts in time.
Lubrication maintenance: Regular lubrication maintenance of mechanical parts to ensure their good operation.
Clean and dust-proof: Keep the motor and control cabinet clean to prevent dust and debris from entering, affecting the performance of the equipment.
5.Troubleshooting:
Fault diagnosis: When there is a fault, professional detection equipment is used to diagnose the motor and determine the cause of the fault.
Timely repair: Repair or replace the fault part according to the diagnosis results to ensure that the equipment returns to normal work as soon as possible.
In short, the correct use and maintenance of the looper clip motor is crucial to ensure the efficient and stable operation of the metal processing line.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
1.Installation and commissioning:
Position selection: According to the layout and process requirements of the production line, the installation position of the looping clip motor is reasonably selected.
Fixed and connected: Install the motor firmly in the designated position, and connect it with the corresponding mechanical transmission components.
Electrical wiring: Correct wiring to ensure reliable connection between the motor and the control system.
2.Start and Stop:
Check before starting: Check the lubrication state of the motor and transmission parts, whether the fasteners are loose, and whether the electrical line is normal.
Smooth start: When starting the motor, it should avoid the impact of instantaneous large current, and use soft start or frequency conversion start.
Normal shutdown: The shutdown should gradually reduce the speed of the motor to prevent sudden stop from impacting the equipment.
3.Operation and control:
Constant tension: The tension control system is used to maintain a constant tension during the operation of the looping motor to avoid strip relaxation or pulling.
Speed synchronization: Adjust the running speed of the motor according to the process requirements, so that it matches the speed of the equipment before and after the process.
Feedback control: Through the sensor and feedback system, real-time monitoring of the motor operating status, adjust the parameters to ensure the stable operation of the production line.
4.Maintenance and maintenance:
Regular inspection: Regularly check the wear of the motor and transmission parts, and replace the damaged parts in time.
Lubrication maintenance: Regular lubrication maintenance of mechanical parts to ensure their good operation.
Clean and dust-proof: Keep the motor and control cabinet clean to prevent dust and debris from entering, affecting the performance of the equipment.
5.Troubleshooting:
Fault diagnosis: When there is a fault, professional detection equipment is used to diagnose the motor and determine the cause of the fault.
Timely repair: Repair or replace the fault part according to the diagnosis results to ensure that the equipment returns to normal work as soon as possible.
In short, the correct use and maintenance of the looper clip motor is crucial to ensure the efficient and stable operation of the metal processing line.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Time of issue : 2024-12-03
1.Basic construction: A typical roller type bedroom spiral hoop usually consists of two sets of rollers that form a spiral shaped channel for guiding and supporting the metal strip.
2.Operation principle: When the metal strip passes through the looper, the strip is guided and supported in the spiral path. Due to the spiral structure of the looper, the strip can be smoothly transmitted under the condition of uneven strip speed to ensure the normal progress of the subsequent process.
3.Commissioning and maintenance: Used equipment needs to be inspected and maintained in detail before use. Includes:
Cleaning: Remove oil, dust and so on from the surface.
Lubrication: Check and add lubricating oil to ensure the normal operation of each transmission component.
Calibration: Ensure that the neutralization pressure of the roller is set correctly.
Replacement parts: Check for wear and replace necessary parts.
4.Application process: In the process of use, it is necessary to pay attention to the operation specifications, monitor the operating status of the equipment, and adjust the equipment parameters in time to meet the strip specifications and process requirements. In addition, it is also necessary to pay attention to safe operation to prevent accidents.
Through the above methods, the used roller bedroom spiral looper can continue to play its function and provide support for metal processing production.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
1.Basic construction: A typical roller type bedroom spiral hoop usually consists of two sets of rollers that form a spiral shaped channel for guiding and supporting the metal strip.
2.Operation principle: When the metal strip passes through the looper, the strip is guided and supported in the spiral path. Due to the spiral structure of the looper, the strip can be smoothly transmitted under the condition of uneven strip speed to ensure the normal progress of the subsequent process.
3.Commissioning and maintenance: Used equipment needs to be inspected and maintained in detail before use. Includes:
Cleaning: Remove oil, dust and so on from the surface.
Lubrication: Check and add lubricating oil to ensure the normal operation of each transmission component.
Calibration: Ensure that the neutralization pressure of the roller is set correctly.
Replacement parts: Check for wear and replace necessary parts.
4.Application process: In the process of use, it is necessary to pay attention to the operation specifications, monitor the operating status of the equipment, and adjust the equipment parameters in time to meet the strip specifications and process requirements. In addition, it is also necessary to pay attention to safe operation to prevent accidents.
Through the above methods, the used roller bedroom spiral looper can continue to play its function and provide support for metal processing production.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Time of issue : 2024-11-30
1.Molding die: used to shape steel strip into pipe. This type of mold usually consists of multiple sets of rollers, and the forming process is completed by gradual pressure.
2.Welding die: Specially used for high-frequency welding process to ensure the quality and accuracy of the weld. These molds are often used to ensure that the joint parts of the pipe are precisely aligned and soldered securely.
3.Sizing die: used for further sizing and straightening of the pipe after welding to ensure the dimensional accuracy of the final product. These molds allow the pipe to achieve the desired diameter and roundness.
4.Shaping mold: used to shape the welded pipe that has been formed to ensure that it meets the specified size and shape requirements.
5.Straightening mold: used to straighten the welded pipe and correct the bending and deformation of the pipe to ensure its flatness in the production process.
6.Surface treatment mold: These molds are used to treat the surface of the pipe, such as deburring, polishing, etc., to ensure the smooth and smooth surface of the pipe.
7.Cutting mold: used to cut the produced welded pipe to the required length according to demand. The main function of these molds is to ensure that the cutting is straight and high precision.
Each mold plays an important role in the production process, ensuring the quality and production efficiency of the welded pipe. According to the specific use and needs, different types of molds can be combined to achieve the best production results.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
1.Molding die: used to shape steel strip into pipe. This type of mold usually consists of multiple sets of rollers, and the forming process is completed by gradual pressure.
2.Welding die: Specially used for high-frequency welding process to ensure the quality and accuracy of the weld. These molds are often used to ensure that the joint parts of the pipe are precisely aligned and soldered securely.
3.Sizing die: used for further sizing and straightening of the pipe after welding to ensure the dimensional accuracy of the final product. These molds allow the pipe to achieve the desired diameter and roundness.
4.Shaping mold: used to shape the welded pipe that has been formed to ensure that it meets the specified size and shape requirements.
5.Straightening mold: used to straighten the welded pipe and correct the bending and deformation of the pipe to ensure its flatness in the production process.
6.Surface treatment mold: These molds are used to treat the surface of the pipe, such as deburring, polishing, etc., to ensure the smooth and smooth surface of the pipe.
7.Cutting mold: used to cut the produced welded pipe to the required length according to demand. The main function of these molds is to ensure that the cutting is straight and high precision.
Each mold plays an important role in the production process, ensuring the quality and production efficiency of the welded pipe. According to the specific use and needs, different types of molds can be combined to achieve the best production results.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Wechat: 13392281699
Email: zty@usedpipemill.com
Company address:No. A99, East Lecong Avenue, Lecong Town, Foshan City, Guangdong Province