【概要描述】These weld quality failures will occur when the used welded pipe units is making pipes: ① through-length lap welding. ② Periodic lap welding. ③ Open the seam. ④ Trachoma. ⑤ Peach-shaped tube. ⑥ Weld seam gnawed. ⑦Outer burr planing. ⑧ Heating. ⑨ The current is small. ⑩ Melting of induction coils and electrodes. ⑪ Fire. ⑫ "No high pressure" phenomenon. We can summarize 12 causes of weld quality failures.

Weld quality failure caused by used welded pipe units (6)

【概要描述】These weld quality failures will occur when the used welded pipe units is making pipes: ① through-length lap welding. ② Periodic lap welding. ③ Open the seam. ④ Trachoma. ⑤ Peach-shaped tube. ⑥ Weld seam gnawed. ⑦Outer burr planing. ⑧ Heating. ⑨ The current is small. ⑩ Melting of induction coils and electrodes. ⑪ Fire. ⑫ "No high pressure" phenomenon. We can summarize 12 causes of weld quality failures.

  • Sort:Information
  • Auth:
  • Source:
  • Release time:2022-03-14 11:30
  • Pvs:
Detail

When manufacturing welded pipes for used welded pipe units, judging that the quality of the welded pipes meets the standard depends on the quality of the welds. Therefore, the quality of the weld is very important, so sometimes it is necessary to rule out the quality of the weld. We perform analyses to understand weld quality failures.

These weld quality failures will occur when the used welded pipe units is making pipes: ① through-length lap welding. ② Periodic lap welding. ③ Open the seam. ④ Trachoma. ⑤ Peach-shaped tube. ⑥ Weld seam gnawed. ⑦Outer burr planing. ⑧ Heating. ⑨ The current is small. ⑩ Melting of induction coils and electrodes. ⑪ Fire. ⑫ "No high pressure" phenomenon. We can summarize 12 causes of weld quality failures.

 

Used welded pipe units

 

Weld seam gnawed

There are two forms of gnawing of welds, one is crescent-shaped scratches; the other is indentation. This kind of trauma is generally relatively minor and will not affect the quality of the weld, but the surface of the pipe is not very beautiful. Lap welds are formed when the depression marks become indented. Pinhole-type sand holes may appear in the crescent-shaped marks produced by the rupture of the upper edge of the extrusion roller hole. Therefore, we distinguish this type of accident from other scratch accidents.

 

(1) Crescent moon marks. The crescent-shaped scratch marks are one of the main scars on the weld, most of which are caused by the squeezing roller. Sometimes the vertical roller that forms a closed hole pattern will also cause scratches, mainly because the upper edge of the hole pattern appears. It is caused by slight cracks falling off the edge or other hard substances sticking to the edge of the hole. Especially after the extrusion roller is heated, many small cracks will be generated on the edge of the hole, and various oxidized metal impurities will be adhered, which is the cause of where the scratching problem lies. When the machine is stopped, we can use our fingers to do a touch inspection along the upper edge of the hole pattern, and repair or replace it according to the situation.

 

(2) Indentation. The indentation is mainly caused by the upper roll forming the closed hole pattern. Due to the characteristics of the hole structure, the bottom diameter of the upper roller is the most stressed. When the hardness of the roll is low, the wear of the pass is accelerated, and when the hardness of the roll is high, the bottom diameter of the pass is very prone to quenching cracks, and the cracked roll edge will cause many slight indentations to the weld. As the quench cracking problem increases and the reduction force increases, the indentation will become more serious. Therefore, it should be replaced in time when the hole type is found to be quenched and cracked.

 

Outer burr planing

Any scars that do not meet the product quality requirements formed after the outer burr is removed are called planing injuries. Although the chance of gouging is very small, it directly affects the appearance quality of the product. In order to reduce planing accidents, the cutting tools should be sharpened first, so as to improve the planing quality and save the tools. Secondly, it is necessary to ensure the stability and flexibility of the planing equipment, and to find a targeted treatment method in the event of an accident.

 

(1) Burning knife. Burning a knife is an accident that happens by accident. Generally, in production, the unit suddenly slows down and the heating temperature is extremely high, or the unit has just started to heat up before reaching the normal speed, which will make the high-temperature burr chips not easy to plan off the pipe surface and accumulate on the cutting edge. The blade burns out. This requires us to pay attention to the coordination and matching of operation actions and time in production, as well as the timely response of operations.

 

(2) The weld is uneven. The longitudinal plane of the weld seam after planing is wavy, which is called planing unevenness. If the waves are as tight as a washboard, it is usually caused by the fact that the relief angle of the cutting tool is too small or the strength of the tool bar is not enough to cause vibration. If the wave is a large wave with a long period, it generally occurs on a smaller pipe diameter. Due to its low weight, the pipe on the idler will bob up and down when planing, forming a wave shape. In addition, the instability of the tool holder will also produce a large wave jump and form a wavy planing result.

 

(3) Planing (scraping) partial. The welded seam after planing is an inclined plane, commonly known as planing (scraping) deviation (Figure 26).

 

Used welded pipe units

 

There are two main reasons for the planing (scraping) deviation.

①That the cutting tool is installed inclined, and this problem is relatively easy to solve.

②Caused by the pipe turning. If it is only a slight planing deviation and does not affect the welding effect, we can adjust the planing knife a little, or control the direction of the welding seam by adjusting the angle and pressure of the guide roller.

 

(4) Plane. Sometimes we can find that a wide and flat wound is left after the burr is removed. In fact, this has nothing to do with planing, but is caused by the "peach-shaped" pipe, which causes the welding seam to form large external burrs after extrusion, so it is necessary to replace the new extrusion roller immediately. Get good weld results and weld gouging quality.

 

The above is one of the reasons for the quality failure of the welding seam when the used welded pipe units is making pipes, such as the welding seam gnawing and the external burr gouging. The main reasons for the formation of weld gnawing are (1)Crescent moon marks. (2) Indentation. There are also the main reasons for the formation of external burr planing (1) burning knife. (2) The weld is uneven. (3) Planing (scraping) partial. (4) Plane.

 

Part of the content of this site comes from the Internet. This site only provides information storage. The copyright belongs to the original author. It does not bear the relevant legal responsibility and does not represent the views and positions of this site. Please contact and delete it if there is any infringement.

关键词:

More News

The personnel training of spiral welding pipe machine
The personnel training of spiral welding pipe machine
The personnel training of spiral welding pipe machine usually involves the following aspects:

1.Equipment introduction and Basic principles:
The composition of the equipment and the function description of each part.
The production principle of spiral welded pipe, including the basic process of forming, welding and shaping steel strip.

2.Safe operation rules and regulations:
Explain safe operation procedures in detail.
Emphasis on the use of personal protective equipment.
Safe operation procedures for equipment start-up, operation and shutdown.

3.Equipment Operation Training:
How to properly start and shut down the device.
Loading and centering adjustment method of steel belt.
Set and adjust welding current and voltage.
How to control production speed and quality control.

4.Common fault diagnosis and treatment:
Common fault identification and elimination methods.
Diagnosis and countermeasures of welding defects.
Routine maintenance and maintenance of equipment.

5.Quality Control:
How to ensure the stability and consistency of welding.
Methods to detect and test the quality of welded pipes, such as ultrasonic inspection, X-ray inspection, etc.

6. Hands-on Training:
Training and guidance in actual operation to ensure that trainees can operate the equipment independently.
Simulate problem handling and emergency response in a production environment.

7.Theoretical and practical evaluation:
Assess the theoretical knowledge and practical skills of the trainees to ensure that they meet the training requirements.

Training is usually conducted by experienced technicians and engineers and includes both detailed written information and field practice. After the training, there may be a corresponding certification or certificate issued as a sign that the operator is qualified.

For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com

JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Detail
The personnel training of spiral welding pipe machine usually involves the following aspects:

1.Equipment introduction and Basic principles:
The composition of the equipment and the function description of each part.
The production principle of spiral welded pipe, including the basic process of forming, welding and shaping steel strip.

2.Safe operation rules and regulations:
Explain safe operation procedures in detail.
Emphasis on the use of personal protective equipment.
Safe operation procedures for equipment start-up, operation and shutdown.

3.Equipment Operation Training:
How to properly start and shut down the device.
Loading and centering adjustment method of steel belt.
Set and adjust welding current and voltage.
How to control production speed and quality control.

4.Common fault diagnosis and treatment:
Common fault identification and elimination methods.
Diagnosis and countermeasures of welding defects.
Routine maintenance and maintenance of equipment.

5.Quality Control:
How to ensure the stability and consistency of welding.
Methods to detect and test the quality of welded pipes, such as ultrasonic inspection, X-ray inspection, etc.

6. Hands-on Training:
Training and guidance in actual operation to ensure that trainees can operate the equipment independently.
Simulate problem handling and emergency response in a production environment.

7.Theoretical and practical evaluation:
Assess the theoretical knowledge and practical skills of the trainees to ensure that they meet the training requirements.

Training is usually conducted by experienced technicians and engineers and includes both detailed written information and field practice. After the training, there may be a corresponding certification or certificate issued as a sign that the operator is qualified.

For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com

JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Conduct training of slitting crew
Conduct training of slitting crew
Time of issue : 2024-12-05
Training a slitting crew usually includes the following key steps:

1.Theoretical Training:
Equipment knowledge: Understand the basic components of the slitting unit and its working principle.
Operation specifications: Familiar with the operation procedures, including starting, stopping, adjusting parameters, common problem handling, etc.
Safety training: Understand the safety risks in equipment operation and corresponding preventive measures, and be familiar with emergency handling methods in emergency situations.
2.Practical operation:
On-site operation demonstration: An experienced operator gives a demonstration on site to guide new employees to master basic operating skills.
Hands-on practice: Let new employees operate the equipment themselves, accumulate experience in actual operation, and solve the problems encountered.
3.Maintenance:
Daily inspection: Train employees to understand the contents and methods of daily inspection of equipment, including cleaning, lubrication, fastening and other work.
Troubleshooting: Teach employees how to identify common equipment failures, understand basic troubleshooting methods and when professional maintenance personnel are required to intervene.

4.Efficiency optimization:
Production Management: Explain how to rationally arrange production tasks to improve equipment utilization and production efficiency.
Data Analysis: Teach employees how to record and analyze production data to find and improve the weak links in production.

5.Assessment and continuous improvement:
Assessment: Evaluate the effectiveness of training through examinations or practical assessments to ensure that employees have the necessary knowledge and skills.
Continuous improvement: Regularly organize training review and skill upgrading courses, and constantly improve the training content according to the actual production and equipment update.

After the training, new employees can work under the supervision of an experienced operator until they are fully competent.

For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com

JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Detail
Training a slitting crew usually includes the following key steps:

1.Theoretical Training:
Equipment knowledge: Understand the basic components of the slitting unit and its working principle.
Operation specifications: Familiar with the operation procedures, including starting, stopping, adjusting parameters, common problem handling, etc.
Safety training: Understand the safety risks in equipment operation and corresponding preventive measures, and be familiar with emergency handling methods in emergency situations.
2.Practical operation:
On-site operation demonstration: An experienced operator gives a demonstration on site to guide new employees to master basic operating skills.
Hands-on practice: Let new employees operate the equipment themselves, accumulate experience in actual operation, and solve the problems encountered.
3.Maintenance:
Daily inspection: Train employees to understand the contents and methods of daily inspection of equipment, including cleaning, lubrication, fastening and other work.
Troubleshooting: Teach employees how to identify common equipment failures, understand basic troubleshooting methods and when professional maintenance personnel are required to intervene.

4.Efficiency optimization:
Production Management: Explain how to rationally arrange production tasks to improve equipment utilization and production efficiency.
Data Analysis: Teach employees how to record and analyze production data to find and improve the weak links in production.

5.Assessment and continuous improvement:
Assessment: Evaluate the effectiveness of training through examinations or practical assessments to ensure that employees have the necessary knowledge and skills.
Continuous improvement: Regularly organize training review and skill upgrading courses, and constantly improve the training content according to the actual production and equipment update.

After the training, new employees can work under the supervision of an experienced operator until they are fully competent.

For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com

JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Looper motors are commonly used in steel rolling lines in the metalworking industry
Looper motors are commonly used in steel rolling lines in the metalworking industry
Looper motors are commonly used in steel rolling lines in the metalworking industry, especially in the production of strips, sheets and tubes. Its main function is to coordinate the movement of the workpiece, maintain a constant tension, and make the strip smooth transition between different processes. The following is the use of looper clip motor and precautions:

1.Installation and commissioning:
Position selection: According to the layout and process requirements of the production line, the installation position of the looping clip motor is reasonably selected.
Fixed and connected: Install the motor firmly in the designated position, and connect it with the corresponding mechanical transmission components.
Electrical wiring: Correct wiring to ensure reliable connection between the motor and the control system.

2.Start and Stop:
Check before starting: Check the lubrication state of the motor and transmission parts, whether the fasteners are loose, and whether the electrical line is normal.
Smooth start: When starting the motor, it should avoid the impact of instantaneous large current, and use soft start or frequency conversion start.
Normal shutdown: The shutdown should gradually reduce the speed of the motor to prevent sudden stop from impacting the equipment.

3.Operation and control:
Constant tension: The tension control system is used to maintain a constant tension during the operation of the looping motor to avoid strip relaxation or pulling.
Speed synchronization: Adjust the running speed of the motor according to the process requirements, so that it matches the speed of the equipment before and after the process.
Feedback control: Through the sensor and feedback system, real-time monitoring of the motor operating status, adjust the parameters to ensure the stable operation of the production line.

4.Maintenance and maintenance:
Regular inspection: Regularly check the wear of the motor and transmission parts, and replace the damaged parts in time.
Lubrication maintenance: Regular lubrication maintenance of mechanical parts to ensure their good operation.
Clean and dust-proof: Keep the motor and control cabinet clean to prevent dust and debris from entering, affecting the performance of the equipment.

5.Troubleshooting:
Fault diagnosis: When there is a fault, professional detection equipment is used to diagnose the motor and determine the cause of the fault.
Timely repair: Repair or replace the fault part according to the diagnosis results to ensure that the equipment returns to normal work as soon as possible.

In short, the correct use and maintenance of the looper clip motor is crucial to ensure the efficient and stable operation of the metal processing line.

For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com

JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Detail
Looper motors are commonly used in steel rolling lines in the metalworking industry, especially in the production of strips, sheets and tubes. Its main function is to coordinate the movement of the workpiece, maintain a constant tension, and make the strip smooth transition between different processes. The following is the use of looper clip motor and precautions:

1.Installation and commissioning:
Position selection: According to the layout and process requirements of the production line, the installation position of the looping clip motor is reasonably selected.
Fixed and connected: Install the motor firmly in the designated position, and connect it with the corresponding mechanical transmission components.
Electrical wiring: Correct wiring to ensure reliable connection between the motor and the control system.

2.Start and Stop:
Check before starting: Check the lubrication state of the motor and transmission parts, whether the fasteners are loose, and whether the electrical line is normal.
Smooth start: When starting the motor, it should avoid the impact of instantaneous large current, and use soft start or frequency conversion start.
Normal shutdown: The shutdown should gradually reduce the speed of the motor to prevent sudden stop from impacting the equipment.

3.Operation and control:
Constant tension: The tension control system is used to maintain a constant tension during the operation of the looping motor to avoid strip relaxation or pulling.
Speed synchronization: Adjust the running speed of the motor according to the process requirements, so that it matches the speed of the equipment before and after the process.
Feedback control: Through the sensor and feedback system, real-time monitoring of the motor operating status, adjust the parameters to ensure the stable operation of the production line.

4.Maintenance and maintenance:
Regular inspection: Regularly check the wear of the motor and transmission parts, and replace the damaged parts in time.
Lubrication maintenance: Regular lubrication maintenance of mechanical parts to ensure their good operation.
Clean and dust-proof: Keep the motor and control cabinet clean to prevent dust and debris from entering, affecting the performance of the equipment.

5.Troubleshooting:
Fault diagnosis: When there is a fault, professional detection equipment is used to diagnose the motor and determine the cause of the fault.
Timely repair: Repair or replace the fault part according to the diagnosis results to ensure that the equipment returns to normal work as soon as possible.

In short, the correct use and maintenance of the looper clip motor is crucial to ensure the efficient and stable operation of the metal processing line.

For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com

JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Apply of Bedroom screw looping
Apply of Bedroom screw looping
Time of issue : 2024-12-03
Bedroom screw looping (generally used in the field of metal working, such as steel rolling) is a device used for specific processing operations. Used roller bedroom spiral looper can still work effectively after proper maintenance and debugging. Its operation mainly includes the following aspects:

1.Basic construction: A typical roller type bedroom spiral hoop usually consists of two sets of rollers that form a spiral shaped channel for guiding and supporting the metal strip.

2.Operation principle: When the metal strip passes through the looper, the strip is guided and supported in the spiral path. Due to the spiral structure of the looper, the strip can be smoothly transmitted under the condition of uneven strip speed to ensure the normal progress of the subsequent process.

3.Commissioning and maintenance: Used equipment needs to be inspected and maintained in detail before use. Includes:
Cleaning: Remove oil, dust and so on from the surface.
Lubrication: Check and add lubricating oil to ensure the normal operation of each transmission component.
Calibration: Ensure that the neutralization pressure of the roller is set correctly.
Replacement parts: Check for wear and replace necessary parts.

4.Application process: In the process of use, it is necessary to pay attention to the operation specifications, monitor the operating status of the equipment, and adjust the equipment parameters in time to meet the strip specifications and process requirements. In addition, it is also necessary to pay attention to safe operation to prevent accidents.

Through the above methods, the used roller bedroom spiral looper can continue to play its function and provide support for metal processing production.

For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com

JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Detail
Bedroom screw looping (generally used in the field of metal working, such as steel rolling) is a device used for specific processing operations. Used roller bedroom spiral looper can still work effectively after proper maintenance and debugging. Its operation mainly includes the following aspects:

1.Basic construction: A typical roller type bedroom spiral hoop usually consists of two sets of rollers that form a spiral shaped channel for guiding and supporting the metal strip.

2.Operation principle: When the metal strip passes through the looper, the strip is guided and supported in the spiral path. Due to the spiral structure of the looper, the strip can be smoothly transmitted under the condition of uneven strip speed to ensure the normal progress of the subsequent process.

3.Commissioning and maintenance: Used equipment needs to be inspected and maintained in detail before use. Includes:
Cleaning: Remove oil, dust and so on from the surface.
Lubrication: Check and add lubricating oil to ensure the normal operation of each transmission component.
Calibration: Ensure that the neutralization pressure of the roller is set correctly.
Replacement parts: Check for wear and replace necessary parts.

4.Application process: In the process of use, it is necessary to pay attention to the operation specifications, monitor the operating status of the equipment, and adjust the equipment parameters in time to meet the strip specifications and process requirements. In addition, it is also necessary to pay attention to safe operation to prevent accidents.

Through the above methods, the used roller bedroom spiral looper can continue to play its function and provide support for metal processing production.

For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com

JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Contact information
Tel: +86-13392281699
Wechat: 13392281699
Email: zty@usedpipemill.com
Company address:No. A99, East Lecong Avenue, Lecong Town, Foshan City, Guangdong Province

Recommendation

Online Inquiry

留言应用名称:
底部留言
描述:

LINK

Contact Us

Tel (wechat): 13336487288
Wechat:+86 13336487288

WhatsApp:+86 13336487288
Email: zty@usedpipemill.com

Address: No. A99, Lecong Avenue East, Lecong Town, Foshan City, Guangdong Province

QRCODE

Copyright 0 2021 jinyujie. 粤ICP备13051810号 Powerby:  300.cn