Used round tube forming machines, the cause of weld quality failure factors—Trachoma
- Sort:Information
- Auth:
- Source:
- Release time:2021-12-31 11:30
- Pvs:
【概要描述】Factors that cause weld quality failures in used round tube forming machines include ①lap welding, ②cycle lap welding, ③opening, and ④bathholes. The following is an introduction to the cause of the weld quality failure factor-sand hole.
Used round tube forming machines, the cause of weld quality failure factors—Trachoma
【概要描述】Factors that cause weld quality failures in used round tube forming machines include ①lap welding, ②cycle lap welding, ③opening, and ④bathholes. The following is an introduction to the cause of the weld quality failure factor-sand hole.
- Sort:Information
- Auth:
- Source:
- Release time:2021-12-31 11:30
- Pvs:
Factors that cause weld quality failures in used round tube forming machines include ①lap welding, ②cycle lap welding, ③opening, and ④bathholes. The following is an introduction to the cause of the weld quality failure factor-sand hole.
Trachoma tube is also a quality accident of weld leakage, but its gaps are short and subtle, some of which are not directly observed by the human eye, and can only be found through testing equipment, so we call this type of tube a trachoma tube. The main reasons for blisters caused by used round tube forming machines are as follows:
(1) Impurities. In particular, the edges of hot-rolled steel strips contain more impurities, and excessive oxides are likely to be formed during welding, and blisters may appear in the weld. In general, this phenomenon rarely occurs, and it is even rarer for materials that have undergone slitting.
(2) The bearing is damaged. This is also one of the important reasons for the trachoma tube, which we have explained in the previous section of the slit tube.
(3)The current is large. When the current output is too large, the weld is prone to overburning. When over-burning occurs, we can see a blue arc at the squeeze point of the squeeze roller, which is like a unique blue arc during arc welding, accompanied by intermittent "squeaking" sounds, and at the same time bursts of light Larger and more particle sparks are ejected, and a large amount of metal becomes liquid liquefaction and is squeezed out to form blisters. At this time, the inner welding rib of the pipe becomes a random bulge, and the outer burr sometimes becomes piled up during planing, and cannot be striped or rolled. When this happens, speed up the vehicle immediately, and reduce the number of magnet rods or reduce the so-called output power if the problem is still not resolved.
(4) Insufficient squeezing force. When the squeezing force is insufficient, trachoma tubes will also appear. Generally, this kind of trachoma tube is not easy to see. Sometimes a black line can be seen at the weld. Or cracks only appeared during the flattening test.
(5) Swing seam. Blasthole tube caused by oscillating seam is the most common one. Often, the seam does not move smoothly between the two squeezing rollers during operation, but oscillates from left to right, sometimes with a large swing range of about 10mm. . When the pipe seam is turned into the hole and not at the squeezing point of the two rollers, a good squeezing effect will not be obtained, which is very likely to cause the production of blisters. The main reason for the swing seam is that the center position of each pass is not correct. Generally, it is not easy to find the source of the problem. It takes a long time to adjust and process. Therefore, it is necessary to re-pull the line from the sizing to the closed pass, which can shorten the accident. Processing time, and some other problems will be cured at the same time. In addition, the bending of the squeeze roller shaft and the guide roller shaft, the sloshing caused by the wear of the bearing, and the large hole shape can cause the pipe blank to wobble. Therefore, the swing seam is a classic example of a result caused by multiple reasons. It's tricky to deal with.
(6) Cracked edges of squeeze roller. Under high temperature operation, the upper edge of the squeeze roll pass is prone to quenching and cracking. When the squeezing roller rotates, insufficient squeezing force occurs at the part where the edge is dropped. If the amount of edge drop is small, the welds can barely bond together. As the amount of edge drop increases, quality problems such as poor adhesion, false welding, pinholes, and open seams will occur, accompanied by scratches. When this problem occurs, a new hole pattern needs to be replaced in time.
(7) Hole type wear. After the pass of the squeeze roll is worn, it can not only cause a slit pipe, but also a blistering pipe. This depends on the degree of wear of the pass and the condition of the raw material, especially the quality of the hot-rolled steel strip.
(8)Material damage. Damage to the edge of the tube blank can also cause blisters. The severity of this kind of trachoma tube is inseparable from the damage condition of the edge of the tube blank. Under normal circumstances, the probability of such an accident is extremely small. As long as we strictly check the supply of raw materials during production and do not make any damage to the edge of the tube blank during production, this quality accident will be overcome.
Due to the above 8 factors, the quality of the welding seam in the used round tube forming machines is caused by sand holes. When the welded pipe is made, it is necessary to check whether the used round tube forming machines has these problems.
More News
Time of issue : 2024-12-06
1.Equipment introduction and Basic principles:
The composition of the equipment and the function description of each part.
The production principle of spiral welded pipe, including the basic process of forming, welding and shaping steel strip.
2.Safe operation rules and regulations:
Explain safe operation procedures in detail.
Emphasis on the use of personal protective equipment.
Safe operation procedures for equipment start-up, operation and shutdown.
3.Equipment Operation Training:
How to properly start and shut down the device.
Loading and centering adjustment method of steel belt.
Set and adjust welding current and voltage.
How to control production speed and quality control.
4.Common fault diagnosis and treatment:
Common fault identification and elimination methods.
Diagnosis and countermeasures of welding defects.
Routine maintenance and maintenance of equipment.
5.Quality Control:
How to ensure the stability and consistency of welding.
Methods to detect and test the quality of welded pipes, such as ultrasonic inspection, X-ray inspection, etc.
6. Hands-on Training:
Training and guidance in actual operation to ensure that trainees can operate the equipment independently.
Simulate problem handling and emergency response in a production environment.
7.Theoretical and practical evaluation:
Assess the theoretical knowledge and practical skills of the trainees to ensure that they meet the training requirements.
Training is usually conducted by experienced technicians and engineers and includes both detailed written information and field practice. After the training, there may be a corresponding certification or certificate issued as a sign that the operator is qualified.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
1.Equipment introduction and Basic principles:
The composition of the equipment and the function description of each part.
The production principle of spiral welded pipe, including the basic process of forming, welding and shaping steel strip.
2.Safe operation rules and regulations:
Explain safe operation procedures in detail.
Emphasis on the use of personal protective equipment.
Safe operation procedures for equipment start-up, operation and shutdown.
3.Equipment Operation Training:
How to properly start and shut down the device.
Loading and centering adjustment method of steel belt.
Set and adjust welding current and voltage.
How to control production speed and quality control.
4.Common fault diagnosis and treatment:
Common fault identification and elimination methods.
Diagnosis and countermeasures of welding defects.
Routine maintenance and maintenance of equipment.
5.Quality Control:
How to ensure the stability and consistency of welding.
Methods to detect and test the quality of welded pipes, such as ultrasonic inspection, X-ray inspection, etc.
6. Hands-on Training:
Training and guidance in actual operation to ensure that trainees can operate the equipment independently.
Simulate problem handling and emergency response in a production environment.
7.Theoretical and practical evaluation:
Assess the theoretical knowledge and practical skills of the trainees to ensure that they meet the training requirements.
Training is usually conducted by experienced technicians and engineers and includes both detailed written information and field practice. After the training, there may be a corresponding certification or certificate issued as a sign that the operator is qualified.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Time of issue : 2024-12-05
1.Theoretical Training:
Equipment knowledge: Understand the basic components of the slitting unit and its working principle.
Operation specifications: Familiar with the operation procedures, including starting, stopping, adjusting parameters, common problem handling, etc.
Safety training: Understand the safety risks in equipment operation and corresponding preventive measures, and be familiar with emergency handling methods in emergency situations.
2.Practical operation:
On-site operation demonstration: An experienced operator gives a demonstration on site to guide new employees to master basic operating skills.
Hands-on practice: Let new employees operate the equipment themselves, accumulate experience in actual operation, and solve the problems encountered.
3.Maintenance:
Daily inspection: Train employees to understand the contents and methods of daily inspection of equipment, including cleaning, lubrication, fastening and other work.
Troubleshooting: Teach employees how to identify common equipment failures, understand basic troubleshooting methods and when professional maintenance personnel are required to intervene.
4.Efficiency optimization:
Production Management: Explain how to rationally arrange production tasks to improve equipment utilization and production efficiency.
Data Analysis: Teach employees how to record and analyze production data to find and improve the weak links in production.
5.Assessment and continuous improvement:
Assessment: Evaluate the effectiveness of training through examinations or practical assessments to ensure that employees have the necessary knowledge and skills.
Continuous improvement: Regularly organize training review and skill upgrading courses, and constantly improve the training content according to the actual production and equipment update.
After the training, new employees can work under the supervision of an experienced operator until they are fully competent.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
1.Theoretical Training:
Equipment knowledge: Understand the basic components of the slitting unit and its working principle.
Operation specifications: Familiar with the operation procedures, including starting, stopping, adjusting parameters, common problem handling, etc.
Safety training: Understand the safety risks in equipment operation and corresponding preventive measures, and be familiar with emergency handling methods in emergency situations.
2.Practical operation:
On-site operation demonstration: An experienced operator gives a demonstration on site to guide new employees to master basic operating skills.
Hands-on practice: Let new employees operate the equipment themselves, accumulate experience in actual operation, and solve the problems encountered.
3.Maintenance:
Daily inspection: Train employees to understand the contents and methods of daily inspection of equipment, including cleaning, lubrication, fastening and other work.
Troubleshooting: Teach employees how to identify common equipment failures, understand basic troubleshooting methods and when professional maintenance personnel are required to intervene.
4.Efficiency optimization:
Production Management: Explain how to rationally arrange production tasks to improve equipment utilization and production efficiency.
Data Analysis: Teach employees how to record and analyze production data to find and improve the weak links in production.
5.Assessment and continuous improvement:
Assessment: Evaluate the effectiveness of training through examinations or practical assessments to ensure that employees have the necessary knowledge and skills.
Continuous improvement: Regularly organize training review and skill upgrading courses, and constantly improve the training content according to the actual production and equipment update.
After the training, new employees can work under the supervision of an experienced operator until they are fully competent.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Time of issue : 2024-12-04
1.Installation and commissioning:
Position selection: According to the layout and process requirements of the production line, the installation position of the looping clip motor is reasonably selected.
Fixed and connected: Install the motor firmly in the designated position, and connect it with the corresponding mechanical transmission components.
Electrical wiring: Correct wiring to ensure reliable connection between the motor and the control system.
2.Start and Stop:
Check before starting: Check the lubrication state of the motor and transmission parts, whether the fasteners are loose, and whether the electrical line is normal.
Smooth start: When starting the motor, it should avoid the impact of instantaneous large current, and use soft start or frequency conversion start.
Normal shutdown: The shutdown should gradually reduce the speed of the motor to prevent sudden stop from impacting the equipment.
3.Operation and control:
Constant tension: The tension control system is used to maintain a constant tension during the operation of the looping motor to avoid strip relaxation or pulling.
Speed synchronization: Adjust the running speed of the motor according to the process requirements, so that it matches the speed of the equipment before and after the process.
Feedback control: Through the sensor and feedback system, real-time monitoring of the motor operating status, adjust the parameters to ensure the stable operation of the production line.
4.Maintenance and maintenance:
Regular inspection: Regularly check the wear of the motor and transmission parts, and replace the damaged parts in time.
Lubrication maintenance: Regular lubrication maintenance of mechanical parts to ensure their good operation.
Clean and dust-proof: Keep the motor and control cabinet clean to prevent dust and debris from entering, affecting the performance of the equipment.
5.Troubleshooting:
Fault diagnosis: When there is a fault, professional detection equipment is used to diagnose the motor and determine the cause of the fault.
Timely repair: Repair or replace the fault part according to the diagnosis results to ensure that the equipment returns to normal work as soon as possible.
In short, the correct use and maintenance of the looper clip motor is crucial to ensure the efficient and stable operation of the metal processing line.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
1.Installation and commissioning:
Position selection: According to the layout and process requirements of the production line, the installation position of the looping clip motor is reasonably selected.
Fixed and connected: Install the motor firmly in the designated position, and connect it with the corresponding mechanical transmission components.
Electrical wiring: Correct wiring to ensure reliable connection between the motor and the control system.
2.Start and Stop:
Check before starting: Check the lubrication state of the motor and transmission parts, whether the fasteners are loose, and whether the electrical line is normal.
Smooth start: When starting the motor, it should avoid the impact of instantaneous large current, and use soft start or frequency conversion start.
Normal shutdown: The shutdown should gradually reduce the speed of the motor to prevent sudden stop from impacting the equipment.
3.Operation and control:
Constant tension: The tension control system is used to maintain a constant tension during the operation of the looping motor to avoid strip relaxation or pulling.
Speed synchronization: Adjust the running speed of the motor according to the process requirements, so that it matches the speed of the equipment before and after the process.
Feedback control: Through the sensor and feedback system, real-time monitoring of the motor operating status, adjust the parameters to ensure the stable operation of the production line.
4.Maintenance and maintenance:
Regular inspection: Regularly check the wear of the motor and transmission parts, and replace the damaged parts in time.
Lubrication maintenance: Regular lubrication maintenance of mechanical parts to ensure their good operation.
Clean and dust-proof: Keep the motor and control cabinet clean to prevent dust and debris from entering, affecting the performance of the equipment.
5.Troubleshooting:
Fault diagnosis: When there is a fault, professional detection equipment is used to diagnose the motor and determine the cause of the fault.
Timely repair: Repair or replace the fault part according to the diagnosis results to ensure that the equipment returns to normal work as soon as possible.
In short, the correct use and maintenance of the looper clip motor is crucial to ensure the efficient and stable operation of the metal processing line.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Time of issue : 2024-12-03
1.Basic construction: A typical roller type bedroom spiral hoop usually consists of two sets of rollers that form a spiral shaped channel for guiding and supporting the metal strip.
2.Operation principle: When the metal strip passes through the looper, the strip is guided and supported in the spiral path. Due to the spiral structure of the looper, the strip can be smoothly transmitted under the condition of uneven strip speed to ensure the normal progress of the subsequent process.
3.Commissioning and maintenance: Used equipment needs to be inspected and maintained in detail before use. Includes:
Cleaning: Remove oil, dust and so on from the surface.
Lubrication: Check and add lubricating oil to ensure the normal operation of each transmission component.
Calibration: Ensure that the neutralization pressure of the roller is set correctly.
Replacement parts: Check for wear and replace necessary parts.
4.Application process: In the process of use, it is necessary to pay attention to the operation specifications, monitor the operating status of the equipment, and adjust the equipment parameters in time to meet the strip specifications and process requirements. In addition, it is also necessary to pay attention to safe operation to prevent accidents.
Through the above methods, the used roller bedroom spiral looper can continue to play its function and provide support for metal processing production.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
1.Basic construction: A typical roller type bedroom spiral hoop usually consists of two sets of rollers that form a spiral shaped channel for guiding and supporting the metal strip.
2.Operation principle: When the metal strip passes through the looper, the strip is guided and supported in the spiral path. Due to the spiral structure of the looper, the strip can be smoothly transmitted under the condition of uneven strip speed to ensure the normal progress of the subsequent process.
3.Commissioning and maintenance: Used equipment needs to be inspected and maintained in detail before use. Includes:
Cleaning: Remove oil, dust and so on from the surface.
Lubrication: Check and add lubricating oil to ensure the normal operation of each transmission component.
Calibration: Ensure that the neutralization pressure of the roller is set correctly.
Replacement parts: Check for wear and replace necessary parts.
4.Application process: In the process of use, it is necessary to pay attention to the operation specifications, monitor the operating status of the equipment, and adjust the equipment parameters in time to meet the strip specifications and process requirements. In addition, it is also necessary to pay attention to safe operation to prevent accidents.
Through the above methods, the used roller bedroom spiral looper can continue to play its function and provide support for metal processing production.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
Wechat: 13392281699
Email: zty@usedpipemill.com
Company address:No. A99, East Lecong Avenue, Lecong Town, Foshan City, Guangdong Province