【概要描述】Operating Procedures for Loopers in Used Welded Pipe Machines Proper operation of loopers is essential for maintaining optimal performance in used welded pipe machines. This comprehensive guide details critical operating considerations for looper systems in used welded pipe machines, covering setup, daily operation, maintenance, and troubleshooting procedures. Pre-Operation Inspection Before starting production on used welded pipe machines, conduct thorough looper inspections: Verify structural integrity of looper frames and supports Check roller conditions for wear patterns (minimum 2mm remaining rubber coating) Confirm proper alignment of entry/exit guides (±0.5mm tolerance) Test tension measurement system calibration Inspect hydraulic/pneumatic systems for leaks (if equipped) Special considerations for used welded pipe machines: Pay extra attention to modified or repaired components Account for potential wear-induced clearances Verify compatibility of replacement parts Startup Sequence Correct looper initialization procedure for used welded pipe machines: Engage manual mode and verify free movement Check emergency stop functionality Confirm proper lubrication flow to all bearings Gradually increase tension to operating parameters Monitor for abnormal vibrations or noises Verify synchronization with upstream/downstream equipment Important notes for used welded pipe machines: Allow longer warm-up periods (typically 15-20 minutes) Be prepared for slower response times Monitor closely during initial material threading Operating Parameters Recommended settings for loopers in used welded pipe machines: Maintain 60-70% of maximum design tension Keep loop height within 60-80% of total capacity Limit speed variations to ±5% of setpoint Maintain roller temperatures below 60°C Adjustments for used welded pipe machines: Reduce maximum tension by 15-20% from original specs Allow greater position tolerance margins Implement more conservative speed ramps Material Handling Guidelines Proper strip handling techniques: Maintain consistent centering (±3mm tolerance) Avoid sharp edges contacting rollers Prevent material overlap during accumulation Monitor for surface defects caused by looper Special precautions for used welded pipe machines: Reduce maximum strip thickness by 10-15% Increase spacing between difficult materials Be prepared for more frequent manual interventions Process Monitoring Requirements Critical parameters to monitor continuously: Tension fluctuations (±5% target) Looper position stability Roller rotation consistency Bearing temperature trends Hydraulic pressure variations (if applicable) Enhanced monitoring for used welded pipe machines: Implement 25% more frequent checks Maintain detailed historical logs Watch for gradual performance drift Changeover Procedures Step-by-step looper adjustment for product changes: Completely drain existing material Reset tension to minimum Adjust guides for new width Verify roller clearance settings Test run with scrap material Fine-tune while monitoring quality Considerations for used welded pipe machines: Allow 30-50% more time for changeovers Verify all adjustments twice Be prepared for trial-and-error fine tuning Emergency Protocols Critical response procedures: Immediate tension release sequence Material retention methods Quick-access shutdown points Post-incident inspection requirements Additional measures for used welded pipe machines: Clearly mark modified safety systems Maintain backup mechanical stops Implement secondary tension relief options Shutdown Sequence Proper looper deactivation steps: Gradually reduce tension to zero Return to neutral position Disengage drive systems Perform quick visual inspection Document any abnormalities Secure area for next shift Special shutdown practices for used welded pipe machines: Allow longer cooldown periods Conduct more thorough end-of-shift inspections Leave systems in most stress-free configuration Maintenance Coordination Essential looper maintenance scheduling: Bearing lubrication every 80 operating hours Roller inspections every 200 hours Full alignment checks every 500 hours Complete overhaul every 2,000 hours Increased maintenance for used welded pipe machines: Reduce all intervals by 25-30% Include component life tracking Plan for unexpected repairs Conclusion Proper operation of loopers in used welded pipe machines requires adapted procedures that account for equipment age and condition. While following these guidelines cannot completely compensate for mechanical wear, they can significantly improve reliability and extend service life. By implementing disciplined operating practices tailored to used welded pipe machines, manufacturers can maintain production efficiency and product quality while maximizing return on their equipment investment. For more information, please pay attention to the website of Jinyujie
Operating Procedures for Loopers in Used Welded Pipe Machines
【概要描述】Operating Procedures for Loopers in Used Welded Pipe Machines
Proper operation of loopers is essential for maintaining optimal performance in used welded pipe machines. This comprehensive guide details critical operating considerations for looper systems in used welded pipe machines, covering setup, daily operation, maintenance, and troubleshooting procedures.
Pre-Operation Inspection
Before starting production on used welded pipe machines, conduct thorough looper inspections:
Verify structural integrity of looper frames and supports
Check roller conditions for wear patterns (minimum 2mm remaining rubber coating)
Confirm proper alignment of entry/exit guides (±0.5mm tolerance)
Test tension measurement system calibration
Inspect hydraulic/pneumatic systems for leaks (if equipped)
Special considerations for used welded pipe machines:
Pay extra attention to modified or repaired components
Account for potential wear-induced clearances
Verify compatibility of replacement parts
Startup Sequence
Correct looper initialization procedure for used welded pipe machines:
Engage manual mode and verify free movement
Check emergency stop functionality
Confirm proper lubrication flow to all bearings
Gradually increase tension to operating parameters
Monitor for abnormal vibrations or noises
Verify synchronization with upstream/downstream equipment
Important notes for used welded pipe machines:
Allow longer warm-up periods (typically 15-20 minutes)
Be prepared for slower response times
Monitor closely during initial material threading
Operating Parameters
Recommended settings for loopers in used welded pipe machines:
Maintain 60-70% of maximum design tension
Keep loop height within 60-80% of total capacity
Limit speed variations to ±5% of setpoint
Maintain roller temperatures below 60°C
Adjustments for used welded pipe machines:
Reduce maximum tension by 15-20% from original specs
Allow greater position tolerance margins
Implement more conservative speed ramps
Material Handling Guidelines
Proper strip handling techniques:
Maintain consistent centering (±3mm tolerance)
Avoid sharp edges contacting rollers
Prevent material overlap during accumulation
Monitor for surface defects caused by looper
Special precautions for used welded pipe machines:
Reduce maximum strip thickness by 10-15%
Increase spacing between difficult materials
Be prepared for more frequent manual interventions
Process Monitoring Requirements
Critical parameters to monitor continuously:
Tension fluctuations (±5% target)
Looper position stability
Roller rotation consistency
Bearing temperature trends
Hydraulic pressure variations (if applicable)
Enhanced monitoring for used welded pipe machines:
Implement 25% more frequent checks
Maintain detailed historical logs
Watch for gradual performance drift
Changeover Procedures
Step-by-step looper adjustment for product changes:
Completely drain existing material
Reset tension to minimum
Adjust guides for new width
Verify roller clearance settings
Test run with scrap material
Fine-tune while monitoring quality
Considerations for used welded pipe machines:
Allow 30-50% more time for changeovers
Verify all adjustments twice
Be prepared for trial-and-error fine tuning
Emergency Protocols
Critical response procedures:
Immediate tension release sequence
Material retention methods
Quick-access shutdown points
Post-incident inspection requirements
Additional measures for used welded pipe machines:
Clearly mark modified safety systems
Maintain backup mechanical stops
Implement secondary tension relief options
Shutdown Sequence
Proper looper deactivation steps:
Gradually reduce tension to zero
Return to neutral position
Disengage drive systems
Perform quick visual inspection
Document any abnormalities
Secure area for next shift
Special shutdown practices for used welded pipe machines:
Allow longer cooldown periods
Conduct more thorough end-of-shift inspections
Leave systems in most stress-free configuration
Maintenance Coordination
Essential looper maintenance scheduling:
Bearing lubrication every 80 operating hours
Roller inspections every 200 hours
Full alignment checks every 500 hours
Complete overhaul every 2,000 hours
Increased maintenance for used welded pipe machines:
Reduce all intervals by 25-30%
Include component life tracking
Plan for unexpected repairs
Conclusion
Proper operation of loopers in used welded pipe machines requires adapted procedures that account for equipment age and condition. While following these guidelines cannot completely compensate for mechanical wear, they can significantly improve reliability and extend service life. By implementing disciplined operating practices tailored to used welded pipe machines, manufacturers can maintain production efficiency and product quality while maximizing return on their equipment investment.
For more information, please pay attention to the website of Jinyujie
- Sort:Information
- Auth:
- Source:
- Release time:2025-06-24 07:50
- Pvs:
Operating Procedures for Loopers in Used Welded Pipe Machines
Proper operation of loopers is essential for maintaining optimal performance in used welded pipe machines. This comprehensive guide details critical operating considerations for looper systems in used welded pipe machines, covering setup, daily operation, maintenance, and troubleshooting procedures.
-
Pre-Operation Inspection
Before starting production on used welded pipe machines, conduct thorough looper inspections:
-
Verify structural integrity of looper frames and supports
-
Check roller conditions for wear patterns (minimum 2mm remaining rubber coating)
-
Confirm proper alignment of entry/exit guides (±0.5mm tolerance)
-
Test tension measurement system calibration
-
Inspect hydraulic/pneumatic systems for leaks (if equipped)
Special considerations for used welded pipe machines:
-
Pay extra attention to modified or repaired components
-
Account for potential wear-induced clearances
-
Verify compatibility of replacement parts
-
Startup Sequence
Correct looper initialization procedure for used welded pipe machines:
-
Engage manual mode and verify free movement
-
Check emergency stop functionality
-
Confirm proper lubrication flow to all bearings
-
Gradually increase tension to operating parameters
-
Monitor for abnormal vibrations or noises
-
Verify synchronization with upstream/downstream equipment
Important notes for used welded pipe machines:
-
Allow longer warm-up periods (typically 15-20 minutes)
-
Be prepared for slower response times
-
Monitor closely during initial material threading
-
Operating Parameters
Recommended settings for loopers in used welded pipe machines:
-
Maintain 60-70% of maximum design tension
-
Keep loop height within 60-80% of total capacity
-
Limit speed variations to ±5% of setpoint
-
Maintain roller temperatures below 60°C
Adjustments for used welded pipe machines:
-
Reduce maximum tension by 15-20% from original specs
-
Allow greater position tolerance margins
-
Implement more conservative speed ramps
-
Material Handling Guidelines

Proper strip handling techniques:
-
Maintain consistent centering (±3mm tolerance)
-
Avoid sharp edges contacting rollers
-
Prevent material overlap during accumulation
-
Monitor for surface defects caused by looper
Special precautions for used welded pipe machines:
-
Reduce maximum strip thickness by 10-15%
-
Increase spacing between difficult materials
-
Be prepared for more frequent manual interventions
-
Process Monitoring Requirements
Critical parameters to monitor continuously:
-
Tension fluctuations (±5% target)
-
Looper position stability
-
Roller rotation consistency
-
Bearing temperature trends
-
Hydraulic pressure variations (if applicable)
Enhanced monitoring for used welded pipe machines:
-
Implement 25% more frequent checks
-
Maintain detailed historical logs
-
Watch for gradual performance drift
-
Changeover Procedures
Step-by-step looper adjustment for product changes:
-
Completely drain existing material
-
Reset tension to minimum
-
Adjust guides for new width
-
Verify roller clearance settings
-
Test run with scrap material
-
Fine-tune while monitoring quality
Considerations for used welded pipe machines:
-
Allow 30-50% more time for changeovers
-
Verify all adjustments twice
-
Be prepared for trial-and-error fine tuning
-
Emergency Protocols
Critical response procedures:
-
Immediate tension release sequence
-
Material retention methods
-
Quick-access shutdown points
-
Post-incident inspection requirements
Additional measures for used welded pipe machines:
-
Clearly mark modified safety systems
-
Maintain backup mechanical stops
-
Implement secondary tension relief options
-
Shutdown Sequence
Proper looper deactivation steps:
-
Gradually reduce tension to zero
-
Return to neutral position
-
Disengage drive systems
-
Perform quick visual inspection
-
Document any abnormalities
-
Secure area for next shift
Special shutdown practices for used welded pipe machines:
-
Allow longer cooldown periods
-
Conduct more thorough end-of-shift inspections
-
Leave systems in most stress-free configuration
-
Maintenance Coordination
Essential looper maintenance scheduling:
-
Bearing lubrication every 80 operating hours
-
Roller inspections every 200 hours
-
Full alignment checks every 500 hours
-
Complete overhaul every 2,000 hours
Increased maintenance for used welded pipe machines:
-
Reduce all intervals by 25-30%
-
Include component life tracking
-
Plan for unexpected repairs
Conclusion
Proper operation of loopers in used welded pipe machines requires adapted procedures that account for equipment age and condition. While following these guidelines cannot completely compensate for mechanical wear, they can significantly improve reliability and extend service life. By implementing disciplined operating practices tailored to used welded pipe machines, manufacturers can maintain production efficiency and product quality while maximizing return on their equipment investment.
For more information, please pay attention to the website of Jinyujie Mechanical and Electrical Used Pipe Mill Supplier:www.usedpipemill.com
JinYuJie-Used Pipe Mills Supplier(Please click the link→) :second-hand pipe mill
More News
Time of issue : 2025-11-13
Time of issue : 2025-11-12
Time of issue : 2025-11-11
Time of issue : 2025-11-10
Wechat: 13392281699
Email: zty@usedpipemill.com
Company address:No. A99, East Lecong Avenue, Lecong Town, Foshan City, Guangdong Province
Recommendation
Online Inquiry
LINK
Contact Us
Tel (wechat): 13336487288
Wechat:+86 13336487288
WhatsApp:+86 13336487288
Email: zty@usedpipemill.com
Address: No. A99, Lecong Avenue East, Lecong Town, Foshan City, Guangdong Province